Meet The Team

Team Laramate

Laramate is a Germany-based software agency and trusted Laravel Community Partner, helping businesses transform fragmented processes into efficient, scalable workflows. Laramate builds custom solutions that drive business value and ensure clients retain full ownership of their code and data.

Every project is anchored in solid architecture, rigorous automated testing, and strategic AI integration. Laramate minimises operational risk and maximises long-term value.

5.0 Stars
Based on 22 reviews

A Message From Our CEO

Christian Wolf
“We believe exceptional software is born from a deep understanding of our clients’ operational processes, never from one-size-fits-all platforms. To us, every project is a long-term partnership, and the most resilient solutions are always built together.”
Christian Wolf
— CEO Laramate GmbH
Christian Wolf

Case Studies

Our Work

MkSiKeGo Documentation Software
React Laravel Tailwind CSS PDF

Construction Site Documentation Software for Safety Coordinators | SiGeKo Inspection App

  • 2,500 Legally Cited Snippets
  • Version control and Audit Trails
  • Gained: Speed, accuracy, deliverables & factual grounding
Therabits Case Study University of Witten/Herdecke
Laravel Filament API Synthesia

AI-Generated Simulator For Pyschology Training

  • Synthesia (AI Video Generation API)
  • Webhook-based Asynchronous Architecture
  • Server-side PDF Generation Library
  • Self-hosted Infrastructure (University Servers)
KAT-TOOL App
ReactNative Tinybase Expo Laravel

Offline-First Audit App for Poultry Welfare Compliance

  • Laravel Backend as Middleware
  • React Native Cross-Platform App Development
  • Offline-First Architecture using Tinybase
PparKing
Laravel Filament

Automated Parking Management with OCR Platenumber Tracking

  • Migration from Laravel Nova to FilamentPHP
  • CCTV Image Processing Pipeline Optimization
  • Municipal API Integration
  • Self-Service Booking Portal
  • Kiosk Interface
  • Customer Complaints Management System
Safetyworx365 LMS
Laravel Filament PDF Email

DGUV-Compliant Safety Training LMS for Construction Workers

  • Laravel Backend Development
  • Filament Admin Panel
  • PDF Certificate Generation
  • Multilingual Platform
  • Server Administration
IAKS Petition Platform
Statamic Email

Platform for Digital Petition Management

  • Statamic website development
  • Laravel backend for petition management
  • Email notifications to drive engagement
Liquiflow
Laravel API GitHub

Webflow to Shopify Theme Converter

  • Backend Development
  • API: GitHub Integration
  • Ongoing Maintenance

Deliverables & Client Satisfaction

What Our Clients Say

Verein für kontrollierte alternative Tierhaltungsformen e.V. - KAT -

Verein für kontrollierte alternative Tierhaltungsformen e.V. - KAT -

Managing Directors & Team

“A trusted, highly competent partner delivering practical, user-focused solutions through close and motivated collaboration.”

Our assignment to Laramate was to develop a mobile app for the digital recording of animal welfare assessments of laying hens in poultry houses. The focus was on a simple and clearly structured user experience to keep the barrier to entry low and ensure that all KAT participants could easily adopt the app.

Through close and trusting collaboration, our requirements were implemented by the highly motivated team led by Christian Wolf and Tobias Kivelip in a results- and user-oriented manner. With a clear structure, their own ideas, and strong commitment (e.g. integrating a Bluetooth scale), Laramate transformed our specifications into a practical solution.

The result is an application that simplifies and digitizes the daily work in the poultry house for KAT laying hen farmers. With nearly 250 downloads within one month after publishing, in this small and not very tech-savvy industry, the outcome speaks for itself. We look forward to continuing our successful collaboration with this highly competent team.

Our project: App Development

Offline-First Audit App for Poultry Welfare Compliance

For Verein für kontrollierte alternative Tierhaltungsformen (KAT) e.V., we developed the KAT-TOOL app. KAT-TOOL modernizes data collection for mandatory poultry welfare evaluations in Germany's egg production industry. The application digitalizes KAT e.V data collection process by replacing cumbersome printed paper sheets with the KAT-TOOL, which connects to our backend to feed KAT e.V database system through an API.

ReactNative Tinybase Expo Laravel
View project
Witten/Herdecke University

Stefan Westermann

Chair holder Faculty of Health, Witten/Herdecke University

“Transparent communication and rock-solid technical execution.”

Over a period of several months, Mr Wolf von Laramate took charge of implementing a complex web application using Laravel and did an outstanding job. The project included, amongst other things, the integration of a third-party API, various user roles, browser-based video and audio recordings, video annotation features, and complex algorithms for the adaptive, personalised tailoring of content to users.

I was particularly impressed by how reliably, competently and methodically Mr Wolf implemented these diverse requirements from a technical perspective. Thanks to regular meetings, our communication remained transparent, pleasant and highly productive at all times. Throughout the project, there were numerous iterations, adjustments and consultations. It was particularly during these phases that Mr Wolf’s particular strengths became apparent: he responded to feedback openly and in a solution-oriented manner, implemented new requirements pragmatically and always explained technical proposals in a way that was easy to understand.

Queries were resolved quickly, and the implementation was carried out professionally and with a keen eye for detail. Overall, working with Mr Wolf was an entirely positive experience. I would work with him again at any time and can recommend him without reservation.

Our project: Web-App / PWA

AI-Generated Simulator For Pyschology Training

Therabits is a web-based training application developed for the University of Witten/Herdecke. Its purpose is to provide psychology students with structured, repeatable practice in therapeutic communication, without exposing real patients to the risks associated with untrained practitioners.

Laravel Filament API Synthesia
View project
Data Training For Psychology Students.
MkSiGeKo

Matthias Klein

Founder, MkSiGeKo

“Outstanding business software, driven by expertise, creativity and collaborative partnership. Laramate delivers real added value and develops solutions that exceed expectations.”

Laramate is an outstanding partner for developing business software at the forefront of modern technology. I have worked with Chris and Tobi for several years and have come to value them not only for their technical competence but also as people. The development of the SiGeKo app I commissioned has advanced enormously through their input. The project now encompasses entirely new use cases that emerged through our ongoing collaboration, well beyond the original brief. Without their commitment and creative problem-solving, this would not have been possible. I look forward to a long-term continued partnership and can recommend Laramate as a reliable partner to anyone who wants to succeed with their business software.

Halbstark GmbH

Jonas Schäuffelen

Managing Director, Halbstark GmbH

“Laramate definitely exceeded our expectations and we recommend them without reservation. We will continue to work with them in the future.”

Our experience with Laramate this year was absolutely outstanding. Chris and his team have always been very committed and proactive in providing us with solutions. The collaboration was extremely constructive and we are very satisfied. Laramate definitely exceeded our expectations and we recommend them without reservation. We will continue to work with them in the future.

Our project: Automation

Webflow to Shopify Theme Converter

Liquiflow is the fast track to design-driven webshops. Design in Webflow, sell with Shopify. Liquiflow converts Webflow templates to Shopify's Liquid. Synchronization to Shopify happens automatically through the GitHub integration.

Laravel API GitHub
View project
Monitor displaying the Liquiflow platform for converting Webflow themes to Shopify.
Pparking SA

Pparking SA

Founder

“Chris and his team work with precision and pay attention to every detail!”

Great contact, precise. Christian and his team successfully mastered the task until the last detail was perfect. I will definitely work with him again.

Our project: CRM & IoT Processing

Automated Parking Management with OCR Platenumber Tracking

Retainer-based development contract to maintain and optimize client's existing application: rebuilt of an automated parking management platform, re-engineering of the CCTV image processing pipeline, migrating from Laravel Nova to FilamentPHP, and building custom interfaces for session validation, self-service booking, and end-user functionality.

Laravel Filament
View project
Monitor displaying the Pparking management system with OCR vehicle entry and exit tracking and complaint handling.
SchleeGleixner GmbH

Nicolas Rettinger

Teamlead Digital, SchleeGleixner GmbH

“The Laramate team solved our very specific request quickly and to our complete satisfaction – highly recommended!”

We approached Laramate with a very specific request, which the team was able to solve within a short time to our complete satisfaction. Even after the project was delivered, Laramate was very helpful with any questions and issues. We can recommend Laramate without reservation and look forward to working together again in the future.

Our project

Building a Multi-Tenant Architecture to Scale SchleeGleixner’ Brand Asset Delivery

Need for a scalable solution to manage and deliver design work across multiple clients simultaneously to maintain separate, branded environments within a single Statamic installation. This entailed creating structured workflows and responsive deliverables within isolated tenant environments. The deliverable: a production-ready, tested multi-tenancy foundation.

Laravel Statamic Multitenancy
View project
Laptop showing Statamic multi-tenant CMS setup with code editor and content management panels.

Looking Back...

How we got here
And why we are still here

10 years ago, Laramate started as a one-person operation. As we grew, we consistently met businesses burdened by the same set of frustrations →

Today, Laramate is a fully limited company, Laramate GmbH, built on a firm conviction, small-to-medium entreprises (SMEs) and B2B businesses deserve transparent, sustainable, and reliable partnerships to fuel their growth.

Building Better Software For Your Workflows

Laramate specialises in modernising legacy architectures and digitalising manual workflows, frequently automating up to 97% of operational bottlenecks. From custom business software to tailor-made, high-performance iOS and Android applications, we design systems explicitly mapped to unique SME business logic. In fact, we run our own business on the very same engineering principles we deploy for you.

Our engagement model is intentionally straightforward; you pay exclusively for high-value, delivered outcomes. No predatory contracts, no bloated overhead, and absolutely no proprietary lock-in.

We cut the noise, keep the architecture lean, and ensure your software is engineered to scale smoothly as your business scales. We focus on the exact metrics that drive real-world momentum: clarity, simplicity, and measurable productivity.

Lost Time & Revenue

Lost Time & Revenue

Unfulfilled promises and missed milestones from software vendors.

Code Unmaintainability

Code Unmaintainability

Fragile codebases that failed to scale alongside user growth or adapt to shifting business demands. 

Lack of Disclosure

Lack of Disclosure

A systemic lack of transparency regarding project terms, timelines and hidden costs.

Vendor Lock-in

Vendor Lock-in

Predatory vendor lock-in that blocked clients from accessing their own data once a contract ended. 

Our Values

Laramate's Daily Drive

Craftsmanship & Passion

Software development is not only a service we provide. It is our craft. We approach every codebase with the precision, intellectual curiosity, and rigorous care it deserves.

Measurable Performance

We build solutions that clearly bridge the gap between your current operational bottlenecks and your future growth. Every system we deploy is designed to scale and deliver a definitive ROI.

Uncompromising Quality

We deliberately specialise in a refined, modern tech stack that we have mastered. Every project we ship features clean, reliable, and highly maintainable code built for the long-term.

Our advice is strictly impartial, pragmatic, and free from hidden vendor obligations. We work in your interest, never a vendor’s, and we remain free of unnecessary proprietary obligations.

Client Projects, Our Responsibility

We take ownership and responsibility for our client projects. To us you're not just an account, you are our partner, we work with, and want to see succeed. 

We are diligent about our automated testing process. Our clients choose us for our deep technical mastery of complex web ecosystems, our unyielding operational accountability, and our collaboration model.

Direct Access

Your primary technical and strategic point of contact is Chris Wolf, CEO and Senior Developer at Laramate GmbH.

With hands-on software development expertise and a deep understanding of business operations, Chris translates your business requirements into practical technical solutions.

You work directly with Chris throughout your project, from initial consultation and technical planning to development and delivery.

What we do best

Why Us Afterall?  

Our Vision

The trusted technology partner for SMEs and B2B businesses across Germany and beyond, delivering high-performance, bespoke software, and the long-term relationships that come with it.

Our Mission

Engage with our clients at every step through transparent communication, building solutions that evolve with their business.

Our Engagement

Our projects run between €180,000 and €375,000, with advanced solutions and complex requirements extending beyond €500,000. Our minimum engagement is €100,000.

Laramate does not charge by the hour.

Laramate works on a flat, project-based fee structure, tied directly to the value of the outcomes it delivers and the expertise it brings, fully agreed upon upfront.

Must-Haves

Our Operating Cadence

We are the antidote to large agency bureaucracy. We have intentionally structured our agency around close-quarters, senior-led collaboration. You get an elite development partner fully accountable for your business outcomes. 

01

Weekly Jour Fixe - JF

Strategic Alignment

Recurring, fixed-time meeting to review sprint velocity, demonstrate working code, and align on upcoming development priorities.

02

Real-Time Project Board

Full Transparency

24/7 access to our active project management dashboard. Track real-time progress and tasks.

03

Dedicated Slack Channel

Rapid Communication

A direct, asynchronous pipeline for fast, day-to-day communication with the entire development team. No long email threads, no delayed responses.

Direct Access

Laramate's Deliverables

Custom mobile iOS and Android app development agency in Bonn, Laramate GmbH. Laramate GmbH builds cross-platform mobile development applications and platforms. End to end mobile development with Laramate GmbH, is an app development software agency in Bonn.

Discovery & Scoping

Uncover business requirements and map out the technical blueprint

Day-to-Day Operations

Day-to-Day Operations

Actively steers the team and delivery milestones

End-to-End Tracking

End-to-End Tracking

Provides transparency through clear progress metrics, risk assessments, and scope changes

No Middle Management

No Middle Management

You speak directly with the senior developers executing the work. Need a quick fix or clarification? Jump straight into a call

Meet Your Team

The Masterminds

Chris Wolf
Chris Wolf
Managing Director, Senior PHP Developer
Tobias Kivelip
Tobias Kivelip
Senior PHP/Laravel Architect
Etheldreda Nanfa
Etheldreda Nanfa
SEO & Content Manager
Portrait of Sergej, creative artist at Laramate
Sergej
Frontend & Media
Marika
Marika
Junior Developer
Marley, the Laramate office dog
Marley
Feel-Good Doggo

Team up with us

We’re growing and hiring. Join us in building innovative, impactful software solutions that simplify processes and move businesses forward.

Apply now

Drop Us a Line

We're off to a flyer
Hop on a call with Chris

  • Business Strategy Consultancy - FREE
  • 1 Team, 1 Project, 1 Outcome
  • Direct Access
  • Response within 24 hours
Your contact person
chris-anzug.jpg
Chris Wolf
Managing Director, Senior PHP Developer

Testimonials

Committed to you
Trusted by them

Halbstark GmbH

Jonas Schäuffelen

Managing Director, Halbstark GmbH

“Laramate definitely exceeded our expectations and we recommend them without reservation. We will continue to work with them in the future.”

Witten/Herdecke University

Stefan Westermann

Chair holder Faculty of Health, Witten/Herdecke University

“Transparent communication and rock-solid technical execution.”

Pflegehelden Franchise GmbH

Nina Halbig

Head of Product, Pflegehelden Franchise GmbH

“The contribution to the further development of our web platform has had a positive impact on code quality and stability.”

Safetyworx365

Stephan Kok

Founder, Safetyworx365

“Laramate developed perfectly tailored training and administration software for me. The result: optimised processes, intuitive operation and professional collaboration. Thank you very much!”

SchleeGleixner GmbH

Nicolas Rettinger

Teamlead Digital, SchleeGleixner GmbH

“The Laramate team solved our very specific request quickly and to our complete satisfaction – highly recommended!”

Good Feeling Products GmbH

Marius Paesler

Head of Marketing, Good Feeling Products GmbH

“I highly recommend Laramate if you are looking for a reliable and effective custom API solution. Top service and a great result!”

PparKing SA

Founder, PparKing SA

“By automating the invoicing process with Bexio, we were able to save a lot of time. The integration into our system was seamless and the collaboration was very professional.”

Megabricks

Thomas Hamels

Head of Trade, Megabricks

“Laramate is a team of professionals! Pleasant communication and the end product is exactly as discussed.”

King Controller GmbH & Co. KG

Jan König

Sales Management, King Controller GmbH & Co. KG

“The Laramate team impressed us with their technical expertise, open communication and proactive problem solving when developing an Api app for Shopify!”

IAKS Deutschland e.V.

Saskya Welter

Social Media Manager, IAKS Deutschland e.V.

“Laramate gave us a website and a platform that fits our needs perfectly. The results are excellent and we highly recommend Chris and his team.”

Pro Bauherr GmbH

Dr. Peter Burnickl

Managing Director, Pro Bauherr GmbH

“We can recommend Laramate without reservation”

KdMed GmbH

Irena Feldner

Manager, KdMed GmbH

“The fast and practical integration and fulfilment of our requirements during the coronavirus pandemic was impressive. Thank you very much!”

Bauhandel24

Eduard Heidt

Owner, Bauhandel24

“Laramate understood my vision and helped us realise it perfectly!”

Sitting on an old (or new) project?

Ways Laramate Can Help You

Build Custom Software

Build Custom Software

Laramate builds SaaS platforms, B2B client portals, internal operations tools, and centralised dashboards designed to eliminate fragile Excel spreadsheets.

Need Al without sending data to OpenAl?

We run on locally hosted models.

As a premier development software company, Laramate provides end-to-end software development service packages engineered to solve critical business bottlenecks. Unlike standard offshore software development or offshore software development, our senior engineers deliver local, high-touch execution across Europe, meeting the exact standards expected from top custom software development London firms.

Scale Existing Solutions

Laramate extends and modernises your existing database, reinforces missing data layers, strengthens your backend infrastructure, plus smart integrations, converts files and syncs themes via GitHub, with zero manual uploads or downloads.

Modernise Legacy System

Modernise Legacy System

Laramate migrates codebases 10+ years old with zero data loss, take over existing systems under its codebase policy, and offers long-term retainers with full code transfer, development, and support.

In the spotlight

Industry Tips & Trends

The Non-Tech in Tech, Leading with Hard and Soft Skills 08.11.2026

Etheldreda – The Non-Tech in Tech. A personal reflection on finding my footing in the tech industry, bridging technical and business perspectives, and demonstrating how complementary hard and soft skills create value within technical teams.

AI Adoption: Our Stance on Local LLMs and Workflows

AI Adoption: Our Stance on Local LLMs and Workflows

Chris Wolf

Chris Wolf

Managing Director, Senior PHP Developer

From the first call to delivery, you talk to me. Call, book an appointment or send me a message.

Send us a message